Rooftop installation · 2024
Skyline Rooftop
Dubai, UAE
Two rooftop courts on the 21st floor of a mixed-use tower, delivered without a single concrete pour on the roof deck.

2
Courts
2024
Delivered
FX-P04
Court model
100%
On-time
The challenge
Roof deck load limits ruled out a poured slab, and all materials had to be craned up outside business hours.
What we built
FX-P04 panoramic courts on the FX-P10 movable steel ring foundation, bolted together on site with zero welding and lifted in pre-cut sections.
Outcome
Zero roof penetrations, and the courts can be relocated if the building is repurposed.




"We spec'd the full panoramic build for our rooftop and the finish quality holds up two years in — under sun, salt and daily play."
Amira Al-Hassan
Director, Skyline Sports Group
More projects



