The build process
From spec sheet
to first serve.
Six steps. One team. Every stage handled by Guru Courts — from the first site measurement to the last calibration check on opening day.
Site survey & feasibility
Our engineers visit your site to assess dimensions, ground conditions, drainage, ceiling height (indoor) and access for materials. We deliver a feasibility report within 5 working days.
- Physical site inspection
- Ground load analysis
- Access & logistics audit
- Feasibility report

Design & specification
We produce 3D renders, structural drawings and a detailed material specification tailored to your site conditions, climate and intended use — competitive play, recreational, or hospitality.
- 3D architectural renders
- Full engineering drawings
- Material specification
- Cost & lead-time proposal

Manufacturing
Fabrication takes place in our Valencia and Riga workshops. Every frame is hot-dip galvanized; every glass panel is tempered and edge-polished. Full QA at every stage before shipping.
- Hot-dip galvanized steel
- Tempered 10/12 mm glass
- ISO 9001 QA process
- 3-week typical lead time

Logistics & shipping
Courts ship in 40-foot containers with full tracking. Our logistics team coordinates customs, port handling and last-mile delivery to your site — anywhere in our 40-country network.
- Container shipping worldwide
- Customs & documentation
- Live shipment tracking
- Insured door-to-door

On-site installation
Our own installation crews assemble every court. The bolt-together modular system requires no on-site welding — meaning cleaner sites, faster builds and easier future relocation.
- Guru Courts installation crew
- 3–7 days per court
- No on-site welding
- Site handover with checklist

Certification & handover
We test the completed court, calibrate lighting, certify to ITF/FIP standards where required, and hand over documentation. Every court ships with up to a 10-year structural warranty.
- ITF / FIP certification available
- Lighting calibration
- Documentation & warranty pack
- 12-month post-install review

Typical timeline: 8–14 weeks from contract to opening.
Site survey (1 wk) → Design (1–2 wks) → Manufacturing (3 wks) → Shipping (1–4 wks) → Install (1 wk) → Certification (1 wk).