Guru Courts

Case studies

Projects.

Every court tells a story. Here are a few of the clubs, venues and private facilities we've built alongside our clients.

Padelstar Teika
Flagship club · 2024

Padelstar Teika

Riga, Latvia

7
Courts
2024
Delivered
100%
On-time

A turnkey installation — from ground survey and structural design through manufacturing, shipping and on-site assembly by our crew.

Read case study
Skyline Rooftop
Rooftop installation · 2024

Skyline Rooftop

Dubai, UAE

2
Courts
2024
Delivered
100%
On-time

A turnkey installation — from ground survey and structural design through manufacturing, shipping and on-site assembly by our crew.

Read case study
Coastal Racquet Club
Outdoor resort · 2023

Coastal Racquet Club

Marbella, Spain

6
Courts
2023
Delivered
100%
On-time

A turnkey installation — from ground survey and structural design through manufacturing, shipping and on-site assembly by our crew.

Read case study
Nordic Padel Arena
Tournament venue · 2023

Nordic Padel Arena

Stockholm, Sweden

12
Courts
2023
Delivered
100%
On-time

A turnkey installation — from ground survey and structural design through manufacturing, shipping and on-site assembly by our crew.

Read case study
City Sports Complex
Municipal facility · 2024

City Sports Complex

Warsaw, Poland

8
Courts
2024
Delivered
100%
On-time

A turnkey installation — from ground survey and structural design through manufacturing, shipping and on-site assembly by our crew.

Read case study
Alpine Members Club
Private members · 2024

Alpine Members Club

Zurich, Switzerland

4
Courts
2024
Delivered
100%
On-time

A turnkey installation — from ground survey and structural design through manufacturing, shipping and on-site assembly by our crew.

Read case study

Testimonials

The clubs and operators we've built with.

"Guru Courts delivered seven tournament-grade courts in Riga on time and on budget. Their engineering and finish quality is best in class."
Kārlis Bērziņš
Founder, Padelstar
"We spec'd the full panoramic build for our rooftop and the finish quality holds up two years in — under sun, salt and daily play."
Amira Al-Hassan
Director, Skyline Sports Group
"The bolt-together modular system meant we opened three weeks earlier than any competitor could promise. Zero on-site welding."
Marco Rossi
Operations, Coastal Racquet Club
"Phasing was the hard part and they handled it. We kept trading through the whole build and the centre court lights up perfectly on camera."
Johan Lindqvist
Venue Director, Nordic Padel Arena
"Every certificate we needed for the tender arrived with the delivery. That alone saved us months of back-and-forth."
Agnieszka Nowak
Facilities Manager, City Sports Complex
"They roofed four courts in ten weeks without taking a single one out of play for longer than a weekend. Our members barely noticed the works."
Daniel Keller
Club Manager, Alpine Members Club